Located in the sector of Pance, between Carrera 117 and Calle 9, made for our client, Constructora Bolivar. This contract included the excavation, loading and removal of the deteriorated raceway, as well as the removal of the deteriorated rolling layer, as well as the supply and installation of approximately 600m3 of Granular Base type Invías. The challenges of this project were that it not only focused on our capacity to supply and technical capacity but also in the implementation of all logistics and commitment of our human talent, given the obligations of our client, the work had to be done in a tight time frame, maintaining the mobility conditions of the residents in that sector.
Conscious of the commitment with our client and with the residents of the sector, a continuous work day of 24 hours was implemented. In which all the work prior to the physical intervention and development of the road was carried out. Reaching the imposed goal and allowing our clients to deliver these routes within their deadline. We were able to demonstrate our willingness and commitment against these type of challenges. .
CONTACT US